![]() Kansas Geological Survey Open-file Report 2003-57 |
The production facility was designed by River City Engineering (Lawrence, KS) and built by American Warrior, Inc. (Garden City, KS). Construction started in 1999 and gas is starting to be processed. The designed capacity of the plant is 5 million standard cubic feet of gas per day (5 MMSCFD).
![]() ![]() ![]() ![]() |
e-mail : webadmin@kgs.ku.edu
Last updated November 2003
http://www.kgs.ku.edu/PRS/publication/2003/ofr2003-57/P3-01.html