Pfannenstiel A #2-24Workover
Well Originally Completed in LP1 Layer
Added Perfs in LP2 Layer (structurally lower than original perfs)
Increased Production –
Before: 2 BOPD 20 BWPD (91% wtr)
After: 23 BOPD 125 BWPD (84% wtr)
Previous slide
Next slide
Back to first slide
View graphic version