Highlights of Flood Implementation
A new injection well will be drilled, cored, logged, and tested to obtain important data.
Surrounding wells will be recompleted in the “C” zone
Five water injection wells will be recompleted to confine the flood
CO2 injection will begin in the second year of the project and alternate slugs of CO2 and water will be injected for a period of 3.6 years
It is planned to inject 0.843 billion cubic feet of CO2 at injection pressures of a minimum of 1300 pounds per square inch (psi)
Produced CO2 will be recycled
Full time water injection will begin in the sixth year of the project
Estimated oil recovery is 75,300 STB (stock tank barrels) at the end of the project (year six)
Additional 18,300 STB produced in years 6-9 after project