Resource Assessment
- L-KC on CKU falls short of total resource required to anchor an 8” pipeline under Base Case Assumptions and most other reasonable scenarios.
-
- Arbuckle could make up deficit, but is more risky
(most Arbuckle not a candidate for Miscible CO2 flood):
- Well connected to aquifer
- BHP is less than MMP (1150 psi vs. 1300 psi)
- Cannot be pressured up above MMP
-
- Arbuckle is being reconsidered
- Immiscible or partially miscible gravity drainage
- Miscible flood in areas with less effective water drive