Subsurface Equipment
Subsurface work needed for CO2 flood
- Perform remedial work on several wells to isolate the L-KC “C” zone (cement squeezes or liners)
- Re-enter one plugged well
- Re-acidize most wells
- Install high pressure wellheads
- Run CO2 compatible injection tubing & packers
- Re-pressure “C” zone in pilot area