Demonstration Design Summary
55 acre, nine-spot
2 CO2 injectors
7 Producers
5 Containment Water Injectors
0.843 BCF CO2 injected-WAG
4.6 year operating life
ᢈ,000 BO estimated recovery during DOE
ᡌ,000 BO in 3 years after DOE Project
Previous slide
Next slide
Back to first slide
View graphic version