Demonstration Design Summary
40 acre, seven-spot
2 CO2 injectors
5 Producers
5 Containment Water Injectors
0.843 BCF CO2 injected-WAG
4.6 year operating life
75,300 BO estimated recovery
18,300 BO in 3 years after DOE Project
Previous slide
Next slide
Back to first slide
View graphic version