Table of Contents
- UPDATE: Field Demonstration of CO2
Miscible Flooding in the L-KC, Central Kansas
- CO2 Pilot Project Team
- Presentation Outline
- Central Kansas Oil Production
- L-KC Pilot Site Located in Largest LKC
Field: Hall-Gurney
- Kansas Oil Production History
- Project History
- Project Economics
- General CO2 Flooding Comments
- Presentation Outline
- Typical E-Log CO2 Pilot Area
- Oomoldic Porosity in Lansing-Kansas
City Reservoirs
- Reservoir Geometry and Structure
- Reservoir Architecture and Log Porosity
-identify layers -digitize logs -calibrate unscaled porosity
- C Zone Oolitic Grainstone
Lithofacies
- Colliver-Carter Leases
- Colliver-Carter Injection Well Photograph
- C Zone: Six Layers, Three
Flooding Cycles
- Carter-Colliver #1 CO2 I
- CO2 I-1 C Zone Lithofacies
- Layer Porosity
- Cat Cay Oolitic Sand Belt, Great Bahama
Banks
- Joulters Ooid Shoal, Great Bahama Banks
- Oolite Sand, Great Bahama Banks
- Presentation Outline
- Demonstration Design Summary
- Model Characteristics
- 3D VIEW of Six Layer Model
- Water Saturation vs Oil Column Height
- Numerical Simulation C-2
Layer
- Numerical Simulation C-2
Layer
- Numerical Simulation C-2
Layer
- Colliver-Carter Lease Production
- Colliver Lease Oil Production Rate and
Cumulative Oil Production
- Pattern Tertiary Oil Production Rate
and Cumulative Oil Production
- Comparsion of TORP Simulated Hall-Gurney
CO2 Pilot Flood
- Presentation Outline
- Residual Oil Saturation at Colliver
Carter #1 CO2 I
- Residual Oil Saturation at Colliver
Carter #1 CO2 I
- Conventional Core Carter-Colliver #1
CO2
I
- Residual Oil Saturation at Colliver
Carter #1 CO2 I
- Presentation Outline
- Lease Scale Economic Variables
- CO2 Costs vs. Oil Price for 20 % IRR
- Sensitivity to Oil Price
- Required Recovery for 20% IRR
- Preliminary CO2 Pipeline
Economics
- Preliminary Resource Assessment on CKU
- L-KC Resource Base as Function of Oil
Price and CO2 Costs
- L-KC Recoveries in Hall-Gurney and Trapp
- Resource Assessment
- Determining Distribution of Low
Pressure Arbuckle
- Low Pressure Arbuckle, Bemis
Field, Ellis Co. Kansas
- Presentation Outline
- Annual Impact Russell Ethanol Plant
- Location of Ethanol Plant and CO2
EOR Site
- Presentation Outline
- Pilot work to Date
- Remainder of Budget Period 1
- Budget Period 2, Year 1
- Sunrise
|