Tertiary Oil Recovery Project Advisory Board Meeting
Click here to start
Table of Contents
Tertiary Oil Recovery Project Advisory Board Meeting
CO2 Project Field Activities
Potential CO2 Flood Pattern
CO2 1 Well Work
CO2 1 Well Work
Photograph:Echometer gun used for the 1st build-up test on CO2 1
Photograph:Echometer equipment
CO2 1 Well Work
X-pert Service Tools PPI Tool (Pin Point Injection) being RIH prior to CO2 1 acid job
Oilmans Acid, Inc. on location for CO2 1 acid job
CO2 1 Well Work
Comparison of Build-up Tests
Echometer setup
Colliver 7 Well Work
Colliver #7 Well configuration as of 1989
Colliver #7 Current Well Configuration (2001)
Colliver #7 Current Well Configuration (2001)
Showing Lansing Stratigraphy
Colliver 7 Well Work
The Rosel Company on location to run Colliver 7 tracer survey
Rosel Company technician fills survey tool with tracer material
Colliver 7 Well Work
Colliver 7 Well Work
Injection line ran from Colliver 10 to Colliver 7
Inline filters installed at Colliver 7
Planned Colliver 10 Well Work
Colliver A-10W Before Workover
Colliver A-10W After Workover
Colliver A-10W After Workover Depicting the Lansing Stratigraphy
Preliminary CO2 Facilities Design
River City Engineerings preliminary production facilities design for CO2 Project
Preliminary CO2 Facilities Design
Preliminary CO2 Facilities Design
Preliminary CO2 Facilities Design
Preliminary CO2 Facilities Design
Arbuckle Efforts
Arbuckle DST Shut-in Pressures
Bemis-Shutts Field, Ellis County, KS
Arbuckle annular gas collected by Precision Wireline
Miniature gun-barrel used to collect Arbuckle oil sample
Miniature gun-barrel
Production Equipment Setup
Ethanol Plant Construction
Ethanol Plant Construction, Russell, KS
Ethanol Plant Construction, Russell, KS