Production
Help

Production - Users Guide

  1. You must log in to GEMINI User/Project Module
  2. Create a New Project, click on one of the Available Projects and Select/Edit Project
  3. Click on Production Icon
  4. From the Project Well List select the desired well and click on the Production icon in the center of the screen.

5. Show Leases - Either from the Leases from the project list or from a specific area (min-max latitude/longitude).

6. Click Next (or if Specific Area is selected - Click Get Leases). The Production module will show number retrieved.

7. Well Production: User Project View. Click on a Lease from the List will show the location of the lease.

Click on the View Production Table to bring up the production history for each lease. Close the window by clicking on the X in the upper right of the screen. Select another lease and repeat as necessary.

View Production Graph

Click on the View Production Graph button to show the Annual Production for that lease. Once the graph is shown on the display, move the mouse into the white area of the graph to show the year and production numbers (as the screen comes up both variables show outside range).

Click on the Graph Options to add leases (or change GridLines, etc.). Click on each lease to add. (be careful not to click on a lease that is already added). Enter the Series Name if different that what is shown and click Ok. Select a color for the graph line and click ok. Repeat for each lease as necessary. A lease can be deleted or edited. Close the window by clicking on the X in the upper right of the screen.

Click on the Graph Options and select Print Graph to send to your printer. Click Yes to print.

Click on the Exit button at the bottom of the screen to close the graph.

View Bubble Map

Click on the View Bubble Map button

Click on the Modify Bubble Map button to add additional leases and change the run times for use with the Play button. Click on each lease to add. (be careful not to click on a lease that is already added). Enter the Series Name if different that what is shown and click Ok. Select a color for the graph line and click ok. Repeat for each lease as necessary. A lease can be deleted or edited. Close the window by clicking on the X in the upper right of the screen.

Click on Play to show Production year by year. Press Pause at anytime to stop. To resume press the Play button. The animation will repeat until the Stop button is clicked. Close the window by clicking on the X in the upper right of the screen.


This page updated July 2003
Comments to webadmin@kgs.ku.edu
http://www.kgs.ku.edu/Gemini/Production/production-tutorial
.html