Material
Balance
Help
A information screen will appear showing:
CASE 1: * Cumulative field oil production at intermittent intervals Then Objectives of MB Module are to : General procedure * Plot F/E vs. We/E CASE 2: * Cumulative field oil production at intermittent intervals Then Objectives of MB Module are to : General procedure * Iterate average reservoir pressure at each time (>0) such that
calculated OOIP is close (within 10%) of volumetric OOIP |
Click the Next button to bring up the calculation screen. Input your changes and click the Next button at the bottom right of the screen. Note: Numbers in red are constants.

Production/Pressure and Carter-Tracy Water Influx Calculations

To see instructions for using this screen click the button "Click here for instruction"

To add a line to the table, right click and select Insert Row. Click in each input field, clear the 0 entry and type in the appropriate number. Continue to add data until you are finished. A chart will display on the bottom of the screen showing either the F/E vs Time or F/E vs We/E. Once you are finished, click the Generate Report button and enter a Output file name. An output report webpage is generated with the tables and the charts.
